|
|
|
|
|
|
|
1-01 |
General |
3/1/2020 |
|
|
1-02 |
Definition Of Terms |
3/1/2020 |
|
|
1-03 |
Supplementary Specifications |
3/1/2020 |
|
|
1-04 |
District Engineer's Authority |
3/1/2020 |
|
|
1-05 |
Requirements for Improvement Plans |
3/1/2020 |
|
|
1-06 |
Indemnification |
3/1/2020 |
|
|
1-07 |
Insurance Requirements |
3/1/2020 |
|
|
1-08 |
Contractor's License Requirements |
3/1/2020 |
|
|
1-09 |
Compliance With Laws & Regulations & Permits |
3/1/2020 |
|
|
1-10 |
Prejob Conference |
3/1/2020 |
|
|
1-11 |
Inspection |
3/1/2020 |
|
|
1-12 |
Safety Requirements |
3/1/2020 |
|
|
1-13 |
Alcohol & Drugs |
3/1/2020 |
|
|
1-14 |
Traffic Obstruction & Control |
3/1/2020 |
|
|
1-15 |
Plans & Specifications On Job Site |
3/1/2020 |
|
|
1-16 |
Construction Water |
3/1/2020 |
|
|
1-17 |
Temporary Lines |
3/1/2020 |
|
|
1-18 |
Responsibility For Damage To Existing Improvements |
3/1/2020 |
|
|
1-19 |
Materials & Workmanship |
3/1/2020 |
|
|
1-20 |
Atmospheric Control |
3/1/2020 |
|
|
1-21 |
Work In County Roads |
3/1/2020 |
|
|
1-22 |
Right-Of-Way & Easements |
3/1/2020 |
|
|
1-23 |
Loss Or Damage |
3/1/2020 |
|
|
1-24 |
Protection Of Property & Utilities |
3/1/2020 |
|
|
1-25 |
Disposal Of Excess Water |
3/1/2020 |
|
|
1-26 |
Superintendence & Labor Competency |
3/1/2020 |
|
|
1-27 |
Work Site Maintenance |
3/1/2020 |
|
|
1-28 |
Use Of Explosives |
3/1/2020 |
|
|
1-29 |
Attorneys Fees |
3/1/2020 |
|
|
1-30 |
Shutdown Periods |
3/1/2020 |
|
|
1-31 |
Project Clean-Up |
3/1/2020 |
|
|
1-32 |
Work Progress |
3/1/2020 |
|
|
1-33 |
1-Year Warranty Of Work |
3/1/2020 |
|
SECTION 2 DESIGN GUIDELINES |
|
|
|
|
|
Table of Contents |
|
|
|
GENERAL |
|
|
1.1 |
Drafting Guidelines |
6/23/2022 |
|
|
1.2 |
AutoCAD Guidelines |
3/1/2020 |
|
|
1.3 |
NOT USED |
|
|
|
1.4 |
NOT USED |
|
|
|
1.5 |
Easements and Encroachments |
3/1/2020 |
|
|
1.6 |
Survey Standards Guideline |
3/1/2020 |
|
|
1.7 |
Record Drawing Guidelines |
3/1/2020 |
|
|
PRIVATE DEVELOPMENT PROJECTS |
|
|
2.1 |
Procedural Guidelines |
3/1/2020 |
|
|
2.2 |
Development Plan and Permit Processing Procedures |
3/1/2020 |
|
|
2.3 |
Water Facility Guidelines |
3/1/2020 |
|
|
2.4 |
Sewer Facility Guidelines |
3/1/2020 |
|
|
AGENCY IMPROVEMENT PROJECTS |
|
|
3.1 |
District Capital Improvement Projects |
3/1/2020 |
|
|
PLANNING |
|
|
4.1 |
Water Planning (PENDING) |
|
|
|
4.2 |
Sewer Planning (PENDING) |
|
|
|
4.3 |
NOT USED |
|
|
|
4.4 |
Sub-Area Master Plan Development |
3/1/2020 |
|
|
4.5 |
NOT USED |
|
|
|
4.6 |
National Pollutant Elimination System (NPDES) |
3/1/2020 |
|
|
4.7 |
Other Agency Permits |
3/1/2020 |
|
|
WATER PIPELINE DESIGN |
|
|
5.1 |
Pressure Pipeline Design |
7/14/2021 |
|
|
5.2 |
Thrust Restraint and Anchor Blocks |
3/1/2020 |
|
|
5.3 |
Line Valves Selection and Placement |
3/1/2020 |
|
|
5.4 |
Fire Hydrants and Fire Services |
3/1/2020 |
|
|
5.5 |
Air Valves |
3/1/2020 |
|
|
5.6 |
Blowoffs |
3/1/2020 |
|
|
5.7 |
Water Services and Test Stations |
3/1/2020 |
|
|
SEWER PIPELINE DESIGN |
|
|
6.1 |
Gravity Sewer Pipeline Design |
3/1/2020 |
|
|
6.2 |
Sewer Manholes and Cleanouts |
3/1/2020 |
|
|
6.3 |
Sewer Laterals |
3/1/2020 |
|
|
6.4 |
Pressure Systems (Force Mains) |
3/1/2020 |
|
|
RESERVOIR DESIGN (PENDING) |
|
|
7.1 |
Storage Facilities |
|
|
|
CONTROL VALVES (PENDING) |
|
|
8.1 |
Pressure/Flow Control Stations |
|
|
|
8.2 |
Vaults |
|
|
|
WATER PUMP STATION DESIGN (PENDING) |
|
|
9.1 |
Water Pump Station Design |
|
|
|
9.2 |
Structural Guidelines |
|
|
|
9.3 |
Noise Control Guidelines |
|
|
|
SEWAGE PUMP STATION DESIGN (PENDING) |
|
|
10.1 |
Sewage Pump (Lift) Station Design |
|
|
|
APPENDIX |
|
|
1.1A |
Hatching and Patterning |
3/1/2020 |
|
|
1.1B |
Leader Lines |
3/1/2020 |
|
|
1.1C |
Detail and Section Callouts |
3/1/2020 |
|
|
1.1D |
Title Sheets |
3/1/2020 |
|
|
1.1E |
Plan and Profile Sheets |
3/1/2020 |
|
|
1.1F |
Detail Sheet |
3/1/2020 |
|
|
1.2 |
CAD Templates |
6/23/2022 |
|
|
2.2A |
Water Plan Checklist |
3/1/2020 |
|
|
2.2B |
Plan Improvement Notes |
3/1/2020 |
|
|
2.2C |
Bond Estimate Worksheet |
3/1/2020 |
|
|
2.3A |
SWRCB Separation Guideline |
3/1/2020 |
|
|
2.4 |
Private Onsite Low Pressure Wastewater Collection Systems |
3/1/2020 |
|
|
|
|
|
|
|
Table of Contents |
|
|
|
W-01 |
Standard Symbols, Abbreviations & Legends |
3/1/2020 |
|
|
W-02 |
Typical Installation for Water Main Appurtenances |
3/1/2020 |
|
|
W-03 |
¾” and 1” Water Service |
10/20/2021 |
|
|
W-03A |
¾” Domestic & 1” Fire Water Service |
1/25/2022 |
|
|
W-04 |
1½” or 2” Water Service |
10/20/2021 |
|
|
W-05 |
3” Water Service |
10/20/2021 |
|
|
W-06 |
3” Water Service Manifold Assembly |
10/20/2021 |
|
|
W-07 |
1 ½” or 2” Fire Service |
10/20/2021 |
|
|
W-08 |
4” and Larger Fire Service Installation (sht 1 & 2) |
10/20/2021 |
|
|
W-09 |
2” Blow off Assembly |
3/1/2020 |
|
|
W-10 |
End of Line 1” Air Vacuum & 2” Blow Off Combinations |
1/25/2022 |
|
|
W-10A |
1" Air Vacuum & 2" Blow Off Combination |
1/25/2022 |
|
|
W-11 |
4” Fire Hydrant Assembly |
5/1/2019 |
|
|
W-12 |
6” Fire Hydrant Assembly |
4/4/2022 |
|
|
W-13 |
1” Air & Vacuum Release Assembly |
9/14/2020 |
|
|
W-14 |
2” Air & Vacuum Release Assembly |
9/14/2020 |
|
|
W-15 |
3” or 4” Combination Air Valve or Air & Vacuum Valve Assemblies |
5/1/2019 |
|
|
W-16 |
Above Ground Enclosure |
3/1/2020 |
|
|
W-17 |
Standard Pipe Zone and Trench Backfill |
5/1/2019 |
|
|
W-18 |
Typical Connection Details to Steel and AC Pipe |
5/1/2019 |
|
|
W-19 |
Butt Strap Closure |
5/1/2019 |
|
|
W-20 |
Concrete Thrust Blocks |
5/1/2019 |
|
|
W-21 |
Concrete Valve Supports for In Line Valves |
5/1/2019 |
|
|
W-22 |
Not Used |
|
|
|
W-23 |
Valve Stem Extension Gate Valves 3” or Smaller |
5/1/2019 |
|
|
W-24 |
Valve Stem Extension Gate Valves 4” and Larger |
5/1/2019 |
|
|
W-25 |
Valve Well Cap and Can Installation |
3/1/2020 |
|
|
W-26 |
Anchor Block Details for In Line Reducers (16” Pipe Max.) |
5/1/2019 |
|
|
W-27 |
Vertical Anchor Block |
5/1/2019 |
|
|
W-28 |
Slope Protection for Grades of 30% or Larger |
5/1/2019 |
|
|
W-29 |
Standard Cutoff Wall |
5/1/2019 |
|
|
W-30 |
Concrete Encasement Detail for U.G. Electrical, Telephone, and Sewer Tight Lines |
5/1/2019 |
|
|
W-31 |
Guard & Marker Post Installation |
5/1/2019 |
|
|
W-32 |
Utility Marker Post Installation |
5/1/2019 |
|
|
W-33 |
Appurtenance Retaining Wall |
5/1/2019 |
|
|
W-34 |
Adjustable Pipe Support Detail |
5/1/2019 |
|
|
W-35 |
Water Quality Sampling Station |
5/1/2019 |
|
|
W-36 |
Project Information Sign |
5/1/2019 |
|
|
W-37 |
Typical Pipe Gate |
5/1/2019 |
|
|
W-38 |
Chain Link Fence Details |
5/1/2019 |
|
|
W-39 |
2-Wire Test Station (Paved) |
5/1/2019 |
|
|
W-40 |
2-Wire Test Station (Unpaved) |
5/1/2019 |
|
|
W-41 |
2 or 4 Wire Test Station |
5/1/2019 |
|
|
W-42 |
At Grade Test Box |
5/1/2019 |
|
|
W-43 |
Buried Insulating Flange |
5/1/2019 |
|
|
W-44 |
Buried Insulating Flange At Grade Test Station |
5/1/2019 |
|
|
W-45 |
4-Wire Casing Test Station |
5/1/2019 |
|
|
W-46 |
Above Grade Insulating Flange |
5/1/2019 |
|
|
W-47 |
Mechanical Joint Bond |
5/1/2019 |
|
|
W-48 |
CML&C Steel Pipe Joint Bond (Wire Jumper) |
5/1/2019 |
|
|
W-49 |
DIP Joint Bonding and Test Lead Connections |
5/1/2019 |
|
|
W-50 |
Single Anode Installation |
5/1/2019 |
|
|
W-51 |
Single Anode Test Station Wiring |
5/1/2019 |
|
|
W-52 |
Prepackaged Magnesium Anode |
5/1/2019 |
|
|
W-53 |
Alumino-Thermic Weld |
5/1/2019 |
|
|
|
|
|
|
Table of Contents |
|
|
|
S-01 |
Legend |
3/1/2020 |
|
|
S-02 |
Concrete Encasement |
3/1/2020 |
|
|
S-03 |
Pipeline Separation Requirements |
3/1/2020 |
|
|
S-04 |
Standard Precast Concrete Manhole (4’ Dia) |
3/1/2020 |
|
|
S-05 |
Standard Precast Concrete Manhole (5’ Dia) |
3/1/2020 |
|
|
S-06 |
Terminus Manhole |
3/1/2020 |
|
|
S-07 |
Standard Precast Concrete Drop Manhole |
3/1/2020 |
|
|
S-08 |
Standard Pipe Zone and Trench Backfill |
3/1/2019 |
|
|
S-09 |
36” Manhole Frame and Two Concentric Covers |
5/1/2019 |
|
|
S-10 |
Not Used |
|
|
|
S-11 |
New Installation PVC Sewer Lateral |
3/1/2020 |
|
|
S-12 |
Deep Cut Sewer Lateral |
3/1/2020 |
|
|
S-13 |
Sewer Lateral Cut In |
5/1/2019 |
|
|
S-14 |
Sewer Lateral Cleanout |
10/20/2021 |
|
|
S-15 |
Support for Undercut |
5/1/2019 |
|
|
S-16 |
Standard Cutoff Wall (Anchor) |
5/1/2019 |
|
|
S-17 |
Sewer Manhole Adjustment (sht 1 and 2) |
3/1/2020 |
|
|
|
|
|
|
Table of Contents |
|
|
|
LPS-01 |
Low Pressure Wastewater Lateral |
3/1/2020 |
|
|
LPS-02 |
On-Site Grinder Pump Residential |
3/1/2020 |
|
|
LPS-03 |
On-Site Grinder Pump Commercial |
3/1/2020 |
|
|
LPS-04 |
Low Pressure Cleanout |
3/1/2020 |
|
|
LPS-05 |
Low Pressure Terminus Cleanout |
3/1/2020 |
|
|
LPS-06 |
Low Pressure Combination Air Valve |
3/1/2020 |
|
|
LPS-07 |
In-Line Plug Valve |
3/1/2020 |
|
|
LPS-08 |
Blowoff |
5/1/2019 |
|
SECTION 4 APPROVED MATERIALS LIST |
|
|
|
|
4.01 |
Water Approved Material List |
8/15/2022 |
|
|
4.02 |
Gravity Sewer Approved Material List |
1/18/2022 |
|
|
4.03 |
Low Pressure Sewer Approved Material List |
3/1/2020 |
|
SECTION 5 STANDARD FORMS |
|
|
|
|
5.01 |
Construction Meter |
3/16/2023 |
|
|
5.02 |
Encroachment Permit |
3/1/2020 |
|
|
5.03 |
Submittal Form |
3/16/2023 |
|
|
5.04 |
Submittal Log |
3/16/2023 |
|
|
5.05 |
Request for Information Form |
3/16/2023 |
|
|
5.06 |
Performance/Warranty Bond |
3/16/2023 |
|
|
5.07 |
Commercial Wastewater Discharge Program Application |
3/1/2020 |
|
|
5.08 |
Project Account Agreement |
3/16/2023 |
|
SECTION 6 TECHNICAL SPECIFICATIONS |
|
|
|
|
|
Table Of Contents |
|
|
|
DIVISION 1 – GENERAL REQUIREMENTS |
|
|
01010 |
Summary of Work |
3/1/2020 |
|
|
01025 |
Measurement and Payment |
3/1/2020 |
|
|
01050 |
Construction Survey |
3/1/2020 |
|
|
01060 |
Safety and Health |
3/1/2020 |
|
|
01080 |
Applicable Codes |
3/1/2020 |
|
|
01090 |
Abbreviations and Symbols |
3/1/2020 |
|
|
01200 |
Project Meetings |
3/1/2020 |
|
|
01292 |
Schedule of Values |
3/1/2020 |
|
|
01300 |
Submittals |
3/1/2020 |
|
|
01300-A |
Submittal Transmittal |
3/1/2020 |
|
|
01312 |
Construction Schedule |
9/15/2022 |
|
|
01400 |
Quality Control |
3/1/2020 |
|
|
01500 |
Temporary Facilities and Controls |
3/1/2020 |
|
|
01505 |
Mobilization / Demobilization |
3/1/2020 |
|
|
01590 |
Field Office |
3/1/2020 |
|
|
01600 |
Products, Materials and Substitution |
3/1/2020 |
|
|
01625 |
Product Delivery, Storage, and Protection |
3/1/2020 |
|
|
01710 |
Cleaning |
3/1/2020 |
|
|
01720 |
Record Drawings |
3/1/2020 |
|
|
01730 |
Operation and Maintenance Data and Manuals |
3/1/2020 |
|
|
01740 |
Guarantee and Warranty |
3/1/2020 |
|
|
01756 |
Testing, Training, and Facility Start-up |
3/1/2020 |
|
|
01999 |
Reference Forms |
3/1/2020 |
|
|
DIVISION 2 – SITE WORK |
|
|
02050 |
Demolition |
3/1/2020 |
|
|
02200 |
Earthwork and Site Preparation |
3/1/2020 |
|
|
02221 |
Trenching, Backfilling, and Compacting |
3/1/2020 |
|
|
02743 |
Asphalt Concrete Paving |
3/1/2020 |
|
|
DIVISION 3 – CONCRETE |
|
|
03100 |
Formwork |
3/1/2020 |
|
|
03200 |
Reinforcing |
3/1/2020 |
|
|
03300 |
Cast-In-Place Concrete |
3/1/2020 |
|
|
03461 |
Precast Concrete Manholes |
3/1/2020 |
|
|
DIVISION 4 – MASONRY (NOT USED) |
|
|
DIVISION 5 – METALS |
|
|
05500 |
Miscellaneous Metals |
3/1/2020 |
|
|
DIVISION 6 – WOOD AND PLASTICS (NOT USED) |
|
|
DIVISION 7 – THERMAL AND MOISTURE PROTECTION (NOT USED) |
|
|
DIVISION 8 – DOORS AND WINDOWS (NOT USED) |
|
|
DIVISION 9 – FINISHES |
|
|
09900 |
General Field Painting and Coating |
3/1/2020 |
|
|
09910 |
Reservoir Painting and Protective Coatings |
3/1/2020 |
|
|
DIVISION 10 – SPECIALTIES (NOT USED) |
|
|
DIVISION 11 – EQUIPMENT |
|
|
11286 |
Cast Iron Slide |
3/1/2020 |
|
|
DIVISION 12 – FURNISHINGS (PENDING) |
|
|
DIVISION 13 – SPECIAL CONSTRUCTION (PENDING) |
|
|
DIVISION 14 – CONVEYING SYSTEMS (NOT USED) |
|
|
DIVISION 15 – MECHANICAL |
|
|
15000 |
General Piping System and Appurtenances |
3/16/2023 |
|
|
15041 |
Disinfection of Pipe and Water Storage Facilities |
3/1/2020 |
|
|
15043 |
Sewer Leakage and Infiltration Testing |
3/1/2020 |
|
|
15044 |
Hydrostatic Testing of Pressure Pipelines |
3/1/2020 |
|
|
15045 |
Closed-Circuit Television (CCTV) Inspections |
3/1/2020 |
|
|
15056 |
Ductile Iron Pipe and Fittings |
3/1/2020 |
|
|
15057 |
Copper Tubing, Brass, Bronze |
3/1/2020 |
|
|
15061 |
Cement Mortar Lined and Coated Steel Pipe and Specials |
3/1/2020 |
|
|
15064 |
Polyvinyl Chloride (PVC) Pressure Pipe |
10/29/2021 |
|
|
15065 |
Polyvinyl Chloride (PVC) Gravity Sewer Pipe |
3/1/2020 |
|
|
15066 |
Temporary Water Mains |
10/29/2021 |
|
|
15074 |
Blowoff Assemblies |
3/1/2020 |
|
|
15099 |
Process Valves and Miscellaneous Valves |
3/1/2020 |
|
|
15100 |
Resilient Wedge Gate Valves |
3/1/2020 |
|
|
15102 |
Butterfly Valves (BFV) |
3/1/2020 |
|
|
15108 |
Combination Air Valve Assemblies |
3/1/2020 |
|
|
15112 |
Backflow Preventers |
3/1/2020 |
|
|
15150 |
High Density Polyethylene (HDPE) Pipe |
3/1/2020 |
|
|
15151 |
Recycled Water Facilities (Offsite) |
3/1/2020 |
|
|
15152 |
Recycled Water Facilities (Onsite) |
3/1/2020 |
|
|
15300 |
Fire Hydrants |
3/1/2020 |
|
|
DIVISION 16 – ELECTRICAL (PENDING) |
|
|
DIVISION 17 – INSTRUMENTATION AND CONTROLS (PENDING) |
|