COVER PAGE

TABLE OF CONTENTS

SECTION 1 GENERAL CONDITIONS

         1-01 General 3/1/2020
         1-02 Definition Of Terms 3/1/2020
         1-03 Supplementary Specifications 3/1/2020
         1-04 District Engineer's Authority 3/1/2020
         1-05 Requirements for Improvement Plans 3/1/2020
         1-06 Indemnification 3/1/2020
         1-07 Insurance Requirements 3/1/2020
         1-08 Contractor's License Requirements 3/1/2020
         1-09 Compliance With Laws & Regulations & Permits 3/1/2020
         1-10 Prejob Conference 3/1/2020
         1-11 Inspection 3/1/2020
         1-12 Safety Requirements 3/1/2020
         1-13 Alcohol & Drugs 3/1/2020
         1-14 Traffic Obstruction & Control 3/1/2020
         1-15 Plans & Specifications On Job Site 3/1/2020
         1-16 Construction Water 3/1/2020
         1-17 Temporary Lines 3/1/2020
         1-18 Responsibility For Damage To Existing Improvements 3/1/2020
         1-19 Materials & Workmanship 3/1/2020
         1-20 Atmospheric Control 3/1/2020
         1-21 Work In County Roads 3/1/2020
         1-22 Right-Of-Way & Easements 3/1/2020
         1-23 Loss Or Damage 3/1/2020
         1-24 Protection Of Property & Utilities 3/1/2020
         1-25 Disposal Of Excess Water 3/1/2020
         1-26 Superintendence & Labor Competency 3/1/2020
         1-27 Work Site Maintenance 3/1/2020
         1-28 Use Of Explosives 3/1/2020
         1-29 Attorneys Fees 3/1/2020
         1-30 Shutdown Periods 3/1/2020
         1-31 Project Clean-Up 3/1/2020
         1-32 Work Progress 3/1/2020
         1-33 1-Year Warranty Of Work 3/1/2020
 

SECTION 2 DESIGN GUIDELINES

         Table of Contents
 

GENERAL

         1.1 Drafting Guidelines 6/23/2022
         1.2 AutoCAD Guidelines 3/1/2020
         1.3 NOT USED
         1.4 NOT USED
         1.5 Easements and Encroachments 3/1/2020
         1.6 Survey Standards Guideline 3/1/2020
         1.7 Record Drawing Guidelines 3/1/2020
 

PRIVATE DEVELOPMENT PROJECTS

         2.1 Procedural Guidelines 3/1/2020
         2.2 Development Plan and Permit Processing Procedures 3/1/2020
         2.3 Water Facility Guidelines 3/1/2020
         2.4 Sewer Facility Guidelines 3/1/2020
 

AGENCY IMPROVEMENT PROJECTS

         3.1 District Capital Improvement Projects 3/1/2020
 

PLANNING

         4.1 Water Planning (PENDING)
         4.2 Sewer Planning (PENDING)
         4.3 NOT USED
         4.4 Sub-Area Master Plan Development 3/1/2020
         4.5 NOT USED
         4.6 National Pollutant Elimination System (NPDES) 3/1/2020
         4.7 Other Agency Permits 3/1/2020
 

WATER PIPELINE DESIGN

         5.1 Pressure Pipeline Design 7/14/2021
         5.2 Thrust Restraint and Anchor Blocks 3/1/2020
         5.3 Line Valves Selection and Placement 3/1/2020
         5.4 Fire Hydrants and Fire Services 3/1/2020
         5.5 Air Valves 3/1/2020
         5.6 Blowoffs 3/1/2020
         5.7 Water Services and Test Stations 3/1/2020
 

SEWER PIPELINE DESIGN

         6.1 Gravity Sewer Pipeline Design 3/1/2020
         6.2 Sewer Manholes and Cleanouts 3/1/2020
         6.3 Sewer Laterals 3/1/2020
         6.4 Pressure Systems (Force Mains) 3/1/2020
 

RESERVOIR DESIGN (PENDING)

         7.1 Storage Facilities
 

CONTROL VALVES (PENDING)

         8.1 Pressure/Flow Control Stations
         8.2 Vaults
 

WATER PUMP STATION DESIGN (PENDING)

         9.1 Water Pump Station Design
         9.2 Structural Guidelines
         9.3 Noise Control Guidelines
 

SEWAGE PUMP STATION DESIGN (PENDING)

         10.1 Sewage Pump (Lift) Station Design
 

APPENDIX

         1.1A Hatching and Patterning 3/1/2020
         1.1B Leader Lines 3/1/2020
         1.1C Detail and Section Callouts 3/1/2020
         1.1D Title Sheets 3/1/2020
         1.1E Plan and Profile Sheets 3/1/2020
         1.1F Detail Sheet 3/1/2020
         1.2 CAD Templates 6/23/2022
         2.2A Water Plan Checklist 3/1/2020
         2.2B Plan Improvement Notes 3/1/2020
         2.2C Bond Estimate Worksheet 3/1/2020
         2.3A SWRCB Separation Guideline 3/1/2020
         2.4 Private Onsite Low Pressure Wastewater Collection Systems 3/1/2020
 

SECTION 3 STANDARD DRAWINGS

WATER

         Table of Contents
         W-01 Standard Symbols, Abbreviations & Legends 3/1/2020
         W-02 Typical Installation for Water Main Appurtenances 3/1/2020
         W-03 ¾” and 1” Water Service 10/20/2021
         W-03A ¾” Domestic & 1” Fire Water Service 1/25/2022
         W-04 1½” or 2” Water Service 10/20/2021
         W-05 3” Water Service 10/20/2021
         W-06 3” Water Service Manifold Assembly 10/20/2021
         W-07 1 ½” or 2” Fire Service 10/20/2021
         W-08 4” and Larger Fire Service Installation (sht 1 & 2) 10/20/2021
         W-09 2” Blow off Assembly 3/1/2020
         W-10 End of Line 1” Air Vacuum & 2” Blow Off Combinations 1/25/2022
         W-10A 1" Air Vacuum & 2" Blow Off Combination 1/25/2022
         W-11 4” Fire Hydrant Assembly 5/1/2019
         W-12 6” Fire Hydrant Assembly 4/4/2022
         W-13 1” Air & Vacuum Release Assembly 9/14/2020
         W-14 2” Air & Vacuum Release Assembly 9/14/2020
         W-15 3” or 4” Combination Air Valve or Air & Vacuum Valve Assemblies 5/1/2019
         W-16 Above Ground Enclosure 3/1/2020
         W-17 Standard Pipe Zone and Trench Backfill 5/1/2019
         W-18 Typical Connection Details to Steel and AC Pipe 5/1/2019
         W-19 Butt Strap Closure 5/1/2019
         W-20 Concrete Thrust Blocks 5/1/2019
         W-21 Concrete Valve Supports for In Line Valves 5/1/2019
         W-22 Not Used
         W-23 Valve Stem Extension Gate Valves 3” or Smaller 5/1/2019
         W-24 Valve Stem Extension Gate Valves 4” and Larger 5/1/2019
         W-25 Valve Well Cap and Can Installation 3/1/2020
         W-26 Anchor Block Details for In Line Reducers (16” Pipe Max.) 5/1/2019
         W-27 Vertical Anchor Block 5/1/2019
         W-28 Slope Protection for Grades of 30% or Larger 5/1/2019
         W-29 Standard Cutoff Wall 5/1/2019
         W-30 Concrete Encasement Detail for U.G. Electrical, Telephone, and Sewer Tight Lines 5/1/2019
         W-31 Guard & Marker Post Installation 5/1/2019
         W-32 Utility Marker Post Installation 5/1/2019
         W-33 Appurtenance Retaining Wall 5/1/2019
         W-34 Adjustable Pipe Support Detail 5/1/2019
         W-35 Water Quality Sampling Station 5/1/2019
         W-36 Project Information Sign 5/1/2019
         W-37 Typical Pipe Gate 5/1/2019
         W-38 Chain Link Fence Details 5/1/2019
         W-39 2-Wire Test Station (Paved) 5/1/2019
         W-40 2-Wire Test Station (Unpaved) 5/1/2019
         W-41 2 or 4 Wire Test Station 5/1/2019
         W-42 At Grade Test Box 5/1/2019
         W-43 Buried Insulating Flange 5/1/2019
         W-44 Buried Insulating Flange At Grade Test Station 5/1/2019
         W-45 4-Wire Casing Test Station 5/1/2019
         W-46 Above Grade Insulating Flange 5/1/2019
         W-47 Mechanical Joint Bond 5/1/2019
         W-48 CML&C Steel Pipe Joint Bond (Wire Jumper) 5/1/2019
         W-49 DIP Joint Bonding and Test Lead Connections 5/1/2019
         W-50 Single Anode Installation 5/1/2019
         W-51 Single Anode Test Station Wiring 5/1/2019
         W-52 Prepackaged Magnesium Anode 5/1/2019
         W-53 Alumino-Thermic Weld 5/1/2019
 

GRAVITY SEWER

         Table of Contents
         S-01 Legend 3/1/2020
         S-02 Concrete Encasement 3/1/2020
         S-03 Pipeline Separation Requirements 3/1/2020
         S-04 Standard Precast Concrete Manhole (4’ Dia) 3/1/2020
         S-05 Standard Precast Concrete Manhole (5’ Dia) 3/1/2020
         S-06 Terminus Manhole 3/1/2020
         S-07 Standard Precast Concrete Drop Manhole 3/1/2020
         S-08 Standard Pipe Zone and Trench Backfill 3/1/2019
         S-09 36” Manhole Frame and Two Concentric Covers 5/1/2019
         S-10 Not Used
         S-11 New Installation PVC Sewer Lateral 3/1/2020
         S-12 Deep Cut Sewer Lateral 3/1/2020
         S-13 Sewer Lateral Cut In 5/1/2019
         S-14 Sewer Lateral Cleanout 10/20/2021
         S-15 Support for Undercut 5/1/2019
         S-16 Standard Cutoff Wall (Anchor) 5/1/2019
         S-17 Sewer Manhole Adjustment (sht 1 and 2) 3/1/2020
 

LOW PRESSURE SEWER

         Table of Contents
         LPS-01 Low Pressure Wastewater Lateral 3/1/2020
         LPS-02 On-Site Grinder Pump Residential 3/1/2020
         LPS-03 On-Site Grinder Pump Commercial 3/1/2020
         LPS-04 Low Pressure Cleanout 3/1/2020
         LPS-05 Low Pressure Terminus Cleanout 3/1/2020
         LPS-06 Low Pressure Combination Air Valve 3/1/2020
         LPS-07 In-Line Plug Valve 3/1/2020
         LPS-08 Blowoff 5/1/2019
 

SECTION 4 APPROVED MATERIALS LIST

         4.01 Water Approved Material List 8/15/2022
         4.02 Gravity Sewer Approved Material List 1/18/2022
         4.03 Low Pressure Sewer Approved Material List 3/1/2020
 

SECTION 5 STANDARD FORMS

         5.01 Construction Meter 3/16/2023
         5.02 Encroachment Permit 3/1/2020
         5.03 Submittal Form 3/16/2023
         5.04 Submittal Log 3/16/2023
         5.05 Request for Information Form 3/16/2023
         5.06 Performance/Warranty Bond 3/16/2023
         5.07 Commercial Wastewater Discharge Program Application 3/1/2020
         5.08 Project Account Agreement 3/16/2023
 

SECTION 6 TECHNICAL SPECIFICATIONS

         Table Of Contents
 

DIVISION 1 – GENERAL REQUIREMENTS

         01010 Summary of Work 3/1/2020
         01025 Measurement and Payment 3/1/2020
         01050 Construction Survey 3/1/2020
         01060 Safety and Health 3/1/2020
         01080 Applicable Codes 3/1/2020
         01090 Abbreviations and Symbols 3/1/2020
         01200 Project Meetings 3/1/2020
         01292 Schedule of Values 3/1/2020
         01300 Submittals 3/1/2020
         01300-A Submittal Transmittal 3/1/2020
         01312 Construction Schedule 9/15/2022
         01400 Quality Control 3/1/2020
         01500 Temporary Facilities and Controls 3/1/2020
         01505 Mobilization / Demobilization 3/1/2020
         01590 Field Office 3/1/2020
         01600 Products, Materials and Substitution 3/1/2020
         01625 Product Delivery, Storage, and Protection 3/1/2020
         01710 Cleaning 3/1/2020
         01720 Record Drawings 3/1/2020
         01730 Operation and Maintenance Data and Manuals 3/1/2020
         01740 Guarantee and Warranty 3/1/2020
         01756 Testing, Training, and Facility Start-up 3/1/2020
         01999 Reference Forms 3/1/2020
 

DIVISION 2 – SITE WORK

         02050 Demolition 3/1/2020
         02200 Earthwork and Site Preparation 3/1/2020
         02221 Trenching, Backfilling, and Compacting 3/1/2020
         02743 Asphalt Concrete Paving 3/1/2020
 

DIVISION 3 – CONCRETE

         03100 Formwork 3/1/2020
         03200 Reinforcing 3/1/2020
         03300 Cast-In-Place Concrete 3/1/2020
         03461 Precast Concrete Manholes 3/1/2020
 

DIVISION 4 – MASONRY (NOT USED)

 

DIVISION 5 – METALS

         05500 Miscellaneous Metals 3/1/2020
 

DIVISION 6 – WOOD AND PLASTICS (NOT USED)

 

DIVISION 7 – THERMAL AND MOISTURE PROTECTION (NOT USED)

 

DIVISION 8 – DOORS AND WINDOWS (NOT USED)

 

DIVISION 9 – FINISHES

         09900 General Field Painting and Coating 3/1/2020
         09910 Reservoir Painting and Protective Coatings 3/1/2020
 

DIVISION 10 – SPECIALTIES (NOT USED)

 

DIVISION 11 – EQUIPMENT

         11286 Cast Iron Slide 3/1/2020
 

DIVISION 12 – FURNISHINGS (PENDING)

 

DIVISION 13 – SPECIAL CONSTRUCTION (PENDING)

 

DIVISION 14 – CONVEYING SYSTEMS (NOT USED)

 

DIVISION 15 – MECHANICAL

         15000 General Piping System and Appurtenances 3/16/2023
         15041 Disinfection of Pipe and Water Storage Facilities 3/1/2020
         15043 Sewer Leakage and Infiltration Testing 3/1/2020
         15044 Hydrostatic Testing of Pressure Pipelines 3/1/2020
         15045 Closed-Circuit Television (CCTV) Inspections 3/1/2020
         15056 Ductile Iron Pipe and Fittings 3/1/2020
         15057 Copper Tubing, Brass, Bronze 3/1/2020
         15061 Cement Mortar Lined and Coated Steel Pipe and Specials 3/1/2020
         15064 Polyvinyl Chloride (PVC) Pressure Pipe 10/29/2021
         15065 Polyvinyl Chloride (PVC) Gravity Sewer Pipe 3/1/2020
         15066 Temporary Water Mains 10/29/2021
         15074 Blowoff Assemblies 3/1/2020
         15099 Process Valves and Miscellaneous Valves 3/1/2020
         15100 Resilient Wedge Gate Valves 3/1/2020
         15102 Butterfly Valves (BFV) 3/1/2020
         15108 Combination Air Valve Assemblies 3/1/2020
         15112 Backflow Preventers 3/1/2020
         15150 High Density Polyethylene (HDPE) Pipe 3/1/2020
         15151 Recycled Water Facilities (Offsite) 3/1/2020
         15152 Recycled Water Facilities (Onsite) 3/1/2020
         15300 Fire Hydrants 3/1/2020
 

DIVISION 16 – ELECTRICAL (PENDING)

 

DIVISION 17 – INSTRUMENTATION AND CONTROLS (PENDING)